Plan Vs Actual Representation / Reports

4D modeling allows the owner to leverage the greatest value out of their BIM during the design phase by visualizing construction sequences in order to develop a phasing sequence to include in the construction documents. 4D modeling in the construction phase can provide both the Contractor and the Owner a better visualization of the planned construction sequences compared to the actual construction sequences.
Using various BIM tools, one can deliver Plan Vs Actual scenario by graphically, in terms of quantities and cost at any given day. Some of BIM tools can deliver them directly Plan Vs, Actual reports and with some of BIM tools, BIM team can work further to produce specific report required by owners or contractors team.